Excellent location at the border with Warsaw (close to Soldier Street) and the PKP Zielonka Bankowa train station - access to downtown Warsaw.
Rent-free apartments in Zielonka at 11 Listopada Street.
Among greenery and single-family buildings.
Intimate, modern layout of the estate, well-thought-out segment layouts, and timeless shape of the buildings.
To ensure the convenience of our future buyers we designed two types of apartments:
I) Variant one, a 5-room apartment (living room with annex and 4 bedrooms) with a garage for two cars, two bathrooms. Area from 108.93 m2 to 109.88 m2. Available apartments with gardens.
II) Variant two, 4-room (living room with annex and 3 bedrooms), 2 bathrooms. Areas from 68.91 m2 to 73.39 m2. Each apartment comes with two external parking spaces and a tenant's garden.
The entire investment includes a total of 10 residential units.
The location of the estate is ideal for families with children as well as for those who value good communication with Warsaw.
In close proximity:
Primary School No. 3 named after Janusz Korczak, Woodrow Wilson Street 34/36.
Preschool Abecadlo, Armii Krajowej Street 37, 05-220 Zielonka.
Playground at the corner of 11 Listopada and Ludwik Waryński streets.
Lidl store, Prymasa Stefana Wyszyńskiego Street 33a.
Biedronka store, Ignacy Paderewski Street 1.
Restaurant: Cubana Ristorante, Stanisława Staszica Street 49.
Zielonka Bankowa train station
Bus stop Zielonka 11 Listopada 01
Bus stop Zielonka Waryńskiego 01
Standard of the Investment finishing in developer state:
Window and door openings
External entrance doors
Garage doors with drive
3-pane PVC windows
3-pane roof windows in the attic
External metal painted window sills
Internal conglomerate window sills, excluding the kitchen/kitchen annex
No internal doors
Insulation of the building (facade)
20 cm thick Styrofoam insulation
20 cm thick mineral wool
External plasters
Central heating, recuperation
Two-function gas condensing furnace with built-in tank
Installed central heating systems - underfloor heating
Wall recuperation
Internal plasters
Gypsum
In bathrooms: plastered ceiling, wall preparation for tiles (rough plaster)
Internal flooring
Cement floors
Roof
Sheet metal tiles, felt on flat roofs
Plastic gutters
Balcony
Cement flooring
Railings
Fencing
Fenced plot, gate with intercom, entrance gate with drive
Wiring inside the apartments
Electrical (without lighting fixtures, outlets, and switches), intercom, alarm, internet)
Access and entrance
Access and walkways to buildings, paving under parking spaces, and external stairs made of paving stones/permeable paving stones
Attic
Insulation with polyurethane foam up to the top of the building, without: profiles, G-K plates, OSB plates, and hatch to the attic
Installations/connections:
Water, sewage, electrical, gas
Completion date by January 31, 2026, documents by March 31, 2026.
BUYERS DO NOT PAY PCC TAX.
Invitation to review the offer.
| Seller: Dominik |Data source: https://www.otodom.pl/pl/oferta/4-pokoje-ogrodek-dwa-miejsca-parkingowe-super-lokalizacja-ID4vVSg.html
Explore nearby amenities to precisely locate your property and identify surrounding conveniences, providing a comprehensive overview of the living environment and the property's convenience.
Mazowieckie, Warsaw, Rembertów