The investment is being built in the area of Hugona Kolataya and Capt. Kazimierz Kaminski streets in the Bacieczki estate. The construction of the estate will consist of three buildings with a maximum of four floors. The modernly designed buildings will create a cozy and friendly space for residents. In the first stage of the investment, building B1 will have residential premises with an area of from 26 to 104m2.
In the offer HUZAR, those interested in purchasing will find apartments one-, two-, three-, four-, and even 5-room with a functional layout of rooms. The buildings will be equipped with quiet elevators to facilitate daily life. Each of the residential premises has a balcony, and some of the premises located on the ground floor have gardens. In the purchase price of the apartment, the buyer also receives a storage room.
For motorized residents, garages are planned on the ground floor and on level -I in the garage hall parking spaces. Cars can also be parked in publicly available parking spaces on the investment site.
On the ground floor of the second building B2, there will be service premises with an area of from 32 to 180m2. Thanks to this solution, residents will be able to easily purchase various articles without having to leave the estate.
The investment has been divided into three stages. The implementation of stage I, during which building B1 will be constructed, will begin in the I quarter of 2024 and is planned to be completed in the IV quarter of 2025.
Spacious, functional apartments with balconies or gardens of various sizes are an excellent proposition for singles, young couples, and families with children.
Nearby we will find:
On the ground floor, garage boxes will be available for purchase, and on level -I, parking spaces.
Specifications:
Area: 68.88 m²
Bedrooms: 3
Floor: 1
Built: 2025
Seller: Sales Department
Data source: https://www.otodom.pl/pl/oferta/promo-huzar-mieszkanie-3-pok-62-ID4q9Xb
Podlaskie, Bialystok, Bialystok, ul. Komisji Edukacji Narodowej