Stage 3.0 is the third installment of the Aleja Debowa investment. In this stage, we offer 44 premises of varying sizes from 74 to 143m2. Some of them have built-in garages, some parking spaces with the possibility of adding a garage shed, and some standard external parking spaces. The new stage refers stylistically and character-wise to the two previous stages. All premises are very functional and well-lit, thanks to numerous glazing. The attractiveness of the offer is also influenced by the standard of execution of the premises. Modern, energy-efficient systems have been used, including: mechanical ventilation with heat recovery (recovery) within the segments, underfloor heating in all rooms, triple-glazed multi-chamber windows with system air inlets meeting the latest thermal standards, sliding terrace windows within the segments, excellent thermal insulation, integrated with a mobile application smog sensor. Right next to the estate, there is a bus stop, and the extension of the tram line from Maly Plaszow to the city bypass at the Przewoz junction is in the design stage. The line will run near Aleja Debowa. The end of construction is scheduled for the 4th quarter of 2025. The presented price offer is for informational purposes only and does not constitute a commercial offer within the meaning of Art.66 par.1 of the Civil Code.
Specifications:
Area: 74.37 m²
Bedrooms: 4
Floor: 0
Built: 2025
Seller: Justyna Storonowicz
Data source: https://www.otodom.pl/pl/oferta/aleja-debowa-nowy-etap-74m2-4-pokoje-promocja-ID4r39e