We offer an energy-efficient (NZEB - Nearly Zero Energy Building), spacious and modern house located in the village of Prace Male, right next to Zlotoklos and Henrykow-Urocze.
Location:
- expressway S7 - 1.5 km,
- primary school - 150 m,
- kindergarten - 1000 m,
- supermarket - 1200 m,
- pizzeria - 300 m,
- access to Galeria Mokotow - 15-20 min,
- access to the center of Warsaw - 30 min.
Standard:
- NIBE heat pump
- photovoltaic installation 15kWp with energy storage 15kWh
- recuperator
- underfloor heating
- aluminum windows
- SmartHome system - energy management, lighting control, garage door control, underfloor heating, ventilation system, and alarm system
- preparation for electric car charging
- connection to fiber optic network
- alarm installation
- double garage
- the house is offered in full developer condition - only interior finishing remains to be done.
The house has been designed in such a way that the annual energy production from the PV installation exceeds the house's demand for heating, ventilation, and hot water. The calculation takes into account self-consumption at the level of about 50% due to storing excess PV energy in batteries.
Location:
Piaseczynska St. 38, Prace Male - about 200m from Piaseczynska St.
Prace Male is a village located just 2km from the Tarczyn North junction on the S7 route. Access to Westfield Mokotow takes a maximum of 20 minutes. The house is being built in the vicinity of a forest, the Tarczynka river, and green areas that cannot be built on. It is a true paradise for recreation enthusiasts, with hiking trails, bike paths, and organized kayaking nearby.
Surrounding amenities include a primary school, kindergartens, and shops.
The house is under construction - completion date - Q1 or Q2 2025.
We invite you to contact us.
Specifications:
Area: 220.0 m²
Bedrooms: 6
Floor: 1
Built: 2025
Data source: https://www.otodom.pl/pl/oferta/nowy-energooszczedny-dom-obok-henrykowa-ID4rDtI