The subject of the announcement is a detached single-family house on a designated plot of land.
NEW PARK Houses Tyniec
We present an investment in Tyniec Maly right next to the forest - NEW PARK Houses Tyniec is being built in 5 stages. The construction of stages I to IV has been completed. The implementation of stage V is scheduled for 2025.
In the offer, buildings are available with an area from 113 sqm + garage 19 sqm (designation "a") to 130 sqm + garage 19 sqm or 38 sqm (designation "b"). A unique advantage is the large plots of up to 500 sqm. Each house has single or double garages and an additional parking space.
DESCRIPTION OF THE INVESTMENT
Modern houses of increased developer standard using energy-saving solutions. Foundation heating plate, insulation of the facade with graphite polystyrene, heat pump, heat recovery unit, underfloor heating of all surfaces, and electrically controlled blinds in every window will ensure maximum functionality, comfort, and safety.
The estate is connected by its own internal road. Each building has additional parking spaces. All buildings have garages.
LOCATION
Single-family houses were built against the backdrop of a forest wall with a beautiful view. A communication advantage is direct access to the bypass and Bielany Wroclawskie. In close proximity, there is a large grocery store, parcel locker, and pharmacy.
Tyniec Maly meets all the conditions for comfortable living, and for families, it offers a nursery, a modern school and kindergarten complex, and a private kindergarten. In close proximity to the estate, there are also several playgrounds, including Zielony Dolek. It is a great place for walks, and in the summer season, we will find numerous outdoor events for families.
NEW STAGE V
We invite you to our website domytyniec or to contact us for information regarding the new stage, which includes 6 detached buildings with garages. The new stage is ALREADY ON SALE! We provide the opportunity to visit show houses, where we present the possibilities of arrangement and finishing interiors in this project.
TIMELINES
Construction completion time for the investment - 2025
Specifications:
Area: 131.07 m²
Bedrooms: 5
Floor: 1
Seller: Dzial Inwestycji Nowy Park Domy Tyniec
Data source: https://www.otodom.pl/pl/oferta/dom-wolnostojacy-nowa-inwestycja-rekuperator-pompa-ciepla-ID4v7Fi