NEW INVESTMENT, HIGHEST STANDARD - COMPLETION OF CONSTRUCTION BY THE END OF 2025. At the beginning of 2025, we started the second stage of construction of a new estate in a prestigious district of Mysłowice, in Morgi. For sale will be the remaining 4 out of 8 luxurious, uniquely designed single-family houses in twin development with a projected area of 135.6 and 138.1 m2, each house located on a plot of 263 m2. The investment stands out at first glance with its modern design and timeless shape. The heart of our houses is a large, well-arranged, and well-lit living room with a kitchen of 40 m2. For future owners, we have designed a parking space that does not interfere with the garage. The gardens in our houses have a southern exposure, ensuring the best possible lighting. The location of the estate guarantees quick access to the center of Katowice (about 10 minutes), the 3 Stawy shopping center, and the Valley of Three Ponds (7 minutes). The houses are located close to the entrance/exit to the A4 motorway and the S1 expressway. The offered houses feature modern and ecological solutions, with the highest emphasis on quality, safety, and user comfort with low operating costs. Each house is finished to a higher developer standard. Buildings equipped with: - complete underfloor heating installation, with a heat pump from De Dietrich - recuperation with cooling and air humidification from Wanas - anti-burglary roller shutters on the ground floor and first floor - electrical installation (alarm, monitoring, internet, TV, roller shutter control) - installation for photovoltaics - plasters and screeds - 3-pane panoramic aluminum windows of the highest thermal standard. - terrace exit (panoramic sliding in the HS system without threshold made of aluminum) - top-class anti-burglary doors from Wiśniowski - garage door with a drive from Wiśniowski - paved terraces with driveways and a belt around the house - paved parking space - rainwater tank installed in the garden. Basic information: - construction: traditional construction method using ceramic block type Porotherm - foundation: foundation slab - roof: flat, insulated with polystyrene and covered with the highest quality PVC membrane - insulation: polystyrene 20 cm meeting the latest thermal standards. Room size breakdown: - GROUND FLOOR: living room with dining room 33.00 m2 kitchen 9.70 m2 corridor 3.00 m2 W.C. 1.80 m2 vestibule 3.30 m2 garage 16.20 m2 boiler room 4.00 m2 Total: 68.30 m2 - FIRST FLOOR in two variants of the house (135.6 / 138.1 m2): room 1 9.10 m2 / 10.40 m2 room 2 14.50 m2 / 15.70 m2 room 3 10.80 m2 bedroom 12.70 m2 bathroom 6.80 m2 corridor 10.10 m2 laundry 3.30 m2 Total: 67.30 m2 / 69.80 m2 Our estate is primarily an excellent location and well-developed infrastructure. In the immediate vicinity of the estate, there are: - private bilingual kindergarten - 300 m - public kindergarten and school 250 m - church - 300m - public transport - 200 m - numerous shops (grocery, pharmacies, etc.) - from 200 to 500 m - restaurants and cafes - from 200 to 400 m - specialist clinics - 400 m - post office - 300 m - cultural center - 300 m The price of the house includes a share in the internal road. The road will be paved and illuminated. If you want to know more details about the above investment, please contact us at the phone number: Mateusz - 570955467 Patryk - 570000835 *The presented price offer is for informational purposes only and does not constitute a commercial offer within the meaning of Art.66 par.1 of the Civil Code.
Specifications:
Area: 135.6 m²
Bedrooms: 5
Bathrooms: 1
Floor: 1
Built: 2025
Seller: Mateusz
Contact: 570955467
Data source: https://www.otodom.pl/pl/oferta/nowoczesne-domy-premium-10-min-do-centrum-katowic-ID4wSYh