EMA Nieruchomosci invites you to familiarize yourself with a new investment of a modern yet comfortable twin house in a green and quiet area in the town of Wierzchowisko.
The two-story house inspired by the project HOUSE UNDER GINKGO 9 BN by the ARCHON company has a usable area of 99.44m2 (the total area on the floor is 105.40m2) in developer condition located on a plot of approx. 320m2.
The plot on which the house is located is fully fenced with a modern panel fence along with a driveway gate, ensuring safety and privacy.
The building is constructed using traditional technology, has a solid structure using proven materials, which guarantees durability and high quality of execution.
All utilities: electricity, gas, water are brought to the building.
Building characteristics:
- The building is insulated with 18cm thick polystyrene, covered with silicone plaster
- Material: POROTHERM block 25cm, partition walls POROTHERM 11.5cm (Wienerberger)
- Roof tiles from Braas, soffit and gutters in graphite color
- Attic insulation with 25cm mineral wool
- 3-glazed window system with 7 chambers from PVC OKNOPLAST - graphite color outside + external window sills
- Internal stairs made of cast reinforced concrete
- Execution of water and sewage installation
- Underfloor heating installed on the ground floor and first floor
- Floors prepared for flooring installation
- Driveway and sidewalks made of KOST-BET paving stones
The house includes:GROUND FLOOR 49.95m2/52.74m2:• Vestibule 4.32m2
• Communication 3.47m2/5.83m2
• Boiler room 3.67m2
• Kitchen and dining room 12.03m2
• Living room 25.49m2
• Toilet 0.97m2/1.40m2
FIRST FLOOR 49.49m2/52.66m2:• Staircase 4.41m2
• Communication 3.70m2
• Room 10.40m2/11.06m2
• Room 12.52m2/13.08m2
• Room 10.35m2/11.52m2
• Walk-in closet 3.24m2/4.03m2
• Bathroom 4.85m2
Why choose our offer?
- Ideal location: quick access to the city center, A1 and DK1 routes
- Quiet and peaceful estate
- Excellent infrastructure - nearby shops, schools, kindergartens, and public transport stops
- AT AN EARLY STAGE OF CONSTRUCTION, THERE IS A POSSIBILITY TO ADAPT THE LAYOUT OF ROOMS BY DESIGNING ADDITIONAL WINDOWS OR MOVING WALLS
The planned completion date for the investment is
Q3 2025!!
FOR THIS OFFER, ALL BROKERAGE COSTS ARE COVERED BY THE PROPERTY OWNER - THE BUYER DOES NOT PAY A FEE TO THE OFFICE.
THE BUYER DOES NOT PAY 2% TAX ON CIVIL LAW TRANSACTIONS!
Do not miss this unique opportunity to purchase a modern house! Contact us to schedule a presentation and see your future place to live.
Legal NoteThe description of the offer contained on the website is based on the inspection of the property and information obtained from the owner, it may be subject to updates and does not constitute an offer defined in art. 66 and subsequent of the Civil Code.Specifications:
Area: 105.4 m²
Bedrooms: 4
Built: 2025
Seller: Magdalena Lapaj
Data source: https://www.otodom.pl/pl/oferta/nowy-blizniak-polnoc-wierzchowisko-ID4wQHJ#map