The right of perpetual usufruct with an area of 1.5 ha, a siding track over 350 m long partially fenced, plus an access section of 200 m, decommissioned (siding regulations from 2012) according to information from PKP, it is possible to reuse it. Power connection for expansion up to 1.5MW. No spatial development plan, in the study production-service areas. Possibility to enlarge the plot by 7000 m2 or to purchase an additional 2.5 ha of storage land next door. Contact Daniel Przybylo 501 520 427
Specifications:
Area: 15000.0 m²
Seller: Daniel Przybylo
Data source: https://www.otodom.pl/pl/oferta/bocznica-kolejowa-sklady-produkcja-odpady-ID4aGAu