The given price is gross.
The investment was completed and accepted for use in September 2021. The service premises with display windows are located directly on Targowa and Skaryszewska streets.
There is a possibility to adapt the premises to your own needs. The premises are handed over in developer standard:
- Sanitary installation completed based on the executive project:
verticals made of "orange" sewer pipes with a diameter of Ø 160 mm. The approach to the sewer in the premises Ø110 is finished just behind the shaft - (arrangement is the responsibility of the Tenant)
- Hot and cold water installation completed based on the executive project: pipes brought to the planned bathroom (and in premises intended for gastronomy to supply the kitchen back office) finished with caps - metered
- Ventilation installation completed based on the executive project:
inlet provided by wall intakes, exhaust through ventilation ducts installed in shafts led to the roof (fan to be installed by the Tenant), electrical supply brought to connect it from the premises. Ducts in the premises are sealed (arrangement is the responsibility of the Tenant), mechanical ventilation brought to places where bathrooms are planned.
- Heating and central heating installation completed based on the executive project: brought to the premises and metered technological heating installation (air/water curtain - purchase and installation is the responsibility of the Tenant) and central heating installation (radiators installed according to the executive project)
- Electrical installation - brought and metered supply, finished with an electrical box,
- Telecommunication installation - brought to the premises and finished with a telecommunication box
- Prepared advertising panels on the facade - to be glued at the Tenant's expense
- Aluminum joinery in black color with safety glass. Entrance doors equipped with a self-closing device and handle. For premises U2, U3, U4, U5, U6, U10, U11 additional access to the premises through doors from the building patio.
- Walls between premises are brick and reinforced concrete columns plastered (machine plaster not painted).
- Partition walls - none (arrangement is the responsibility of the Tenant).
- Ceiling - reinforced concrete, not plastered (arrangement is the responsibility of the Tenant) installation pipes for sewage and technological heating are led above the ceiling.
- Floor - cement screed M12 reinforced with dispersed fiber gr. 5 cm, PE foil, acoustic polystyrene gr. 3 cm, EPS 100 polystyrene gr. 3 cm (finishing up to 2 cm is the responsibility of the Tenant)
- The building has a designated waste bin for service tenants
Specifications:
Area: 99.35 m²
Floor: 0
Built: 2021
Seller: BJM Development
Data source: https://www.otodom.pl/pl/oferta/targowa-10-lokal-uslugowy-u3-ID4tGdY#map