The investment "Winter Apartments" was created in the picturesque town of Goczalkowice-Zdroj. Here we will find new, comfortable apartments with gardens or balconies as well as two-level apartments with viewing terraces. The investment was realized by the company NEXX DEVELOPER, which has been present in the real estate market for 23 years. The optimal location of the apartments combines extensive recreational areas with excellent communication with neighboring cities due to proximity to the DK1 route and access to the train station. Undoubtedly, the advantage of Winter Apartments is the location in a green area, rich in bike paths, next to the Kapias gardens and near Goczalkowickie Lake.
The premises present a high developer standard, equipped with underfloor heating, electrically controlled external blinds, and all installations. Each apartment comes with a parking space. Ground floor apartments have access to a terrace and individual gardens, while higher floors have balconies or spacious terraces. The developer offers as many as 11 finishing options, which can facilitate the interior arrangement process.
On the ground floor of the building, a separate technical and utility zone has been designed for building service and a room for bicycles.
All residential premises are accessible to people with disabilities, the ground floor of the building is at the level of the plot, and higher floors can be accessed by an elevator.
The building will be constructed using traditional technology with silicate blocks. Finished with external acrylic plaster, with a roof covering made of roofing sheet and PVC joinery.
With the elderly and those with limited mobility in mind, access and internal communication have been designed without tripping hazards and comfortable, wide entrance doors. The designed ramp and access to the building are obstacle-free.
The building will be equipped with internal installations:
internal water supply installation, internal sanitary sewage installation, internal gas installation - gas installation brought to the building's boiler room, internal central heating installation, internal electrical installations; internet installation, entrance bell signaling installation, internal telecommunication installation. The lighting of the area with parking spaces near the building is designed using energy-saving LED fixtures placed in standing lamps.
The plot is flat, partially fenced, with direct access from Zimowa street. An internal communication system, parking spaces, and pedestrian paths have been designed on the plot.
There is no development on the eastern and western sides of the plot. To the south, there is low single-family development, while in the northern part of the plot, there are existing warehouse and production buildings.
A two-story production facility located closest to the planned building will be converted into an office-service building in the second stage of the investment.
FINISHING STANDARD OF THE RESIDENTIAL PREMISES
External doors from the staircase
Plastic windows and balcony doors
Metal external window sills painted with powder
Bathroom prepared for tiling, without white installation
Gypsum plaster on the walls
Sanitary installations:
– hot water installation – hot water from the gas boiler in the building.
– cold water installation – with a meter, distribution in the apartment installation in the floor and walls,
– C.O. installation – underfloor heating or radiators.
– sanitary sewage: distribution of sanitary sewage in sanitary rooms, kitchen in floors and walls,
– ventilation – gravity ventilation in kitchen and sanitary rooms.
Electrical installations:
– electrical and lighting installation and sockets:
a. brought to the premises – three-phase 400V,
b. distributed in the premises lighting and sockets,
c. lighting – wire ends terminated with a connector,
d. 230V sockets, distribution of installation, basic equipment,
e. 400V supply – 1 connection in the kitchen for the stove terminated with an electrical box.
Low-current installations:
– telephone installation – distribution of installation, 1 socket in the living room,
– cable television installation – through the telephone installation provider,
– internet installation – distribution of installation, 1 socket in the living room (this is also the telephone installation),
– intercom installation – 1 point, hallway,
– television antenna installation (digital terrestrial programs).
meters for hot and cold water, electricity, and heat consumption in the hallway.
Subfloors for floors – concrete screed
Balconies – finished with ceramic tiles, railings.
The standard equipment of the apartment does not include:
– floors and floor coverings,
– white installation and fittings in sanitary rooms and kitchen,
– electrical equipment – lamps, sconces, lighting fixtures, etc.
– electric stove and kitchen hood,
– internal doors,
– smoothing and painting,
– furniture and household appliances.
Our professional financial advisors are at your disposal, who will help you for FREE in matching the best mortgage offer tailored to your needs.
I will be happy to answer additional questions. Interested parties are invited to contact me.
Sincerely,
Sylwia Kocik
ALL Estate Katowice
.allestate.pl Dabrowskiego 1/7 | 40-035 Katowice | Poland
T.: +48 780 110 652
Specifications:
Area: 105.4 m²
Bedrooms: 3
Floor: 0
Built: 2023
Seller: Sylwia Kocik
Contact: +48 780 110 652
Data source: https://www.otodom.pl/pl/oferta/apartament-105m2-ogrod-i-dwa-tarasy-94m2-ID4tRBk