Remigiusz Pawlicki
tel. 577 677 808
* buyer does not pay commission or PCC
* developer state to finish
* quiet, peaceful area rich in walking areas
* functional, providing comfort layouts of houses
Ready already in September!Room layout:Ground floor:-Vestibule
-Corridor
-Garage
-Boiler room
-Bathroom
-Room with kitchenette
-Exit to the garden with terrace
First floor:-Bedroom with wardrobe
-Wardrobe
-Bathroom
-Corridor
-Room
-Room
-Room
Land area 187.50 m2
FINISHING STANDARD OF HOUSES1. structure - mixed, brick/concrete walls, foundation in the form of concrete strips
concrete, foundation walls concrete
2. monolithic concrete ceilings,
3. external walls - brick, lime-sand blocks, insulated with polystyrene,
4. internal walls: lime-sand blocks/gypsum type ORTH,
5. finishing of internal structural and partition walls - machine plaster
gypsum, walls made of gypsum blocks type ORTH plastered,
in wet rooms made of gypsum blocks in raw state,
other walls plastered smoothed “to sharp”, ceilings plastered
6. finishing of floors - screed substrate smoothed prepared for
floor coverings,
7. window joinery PVC, externally anthracite color RAL 7024, internally
white RAL 9001, terrace doors aluminum, in color RAL 7024,
tilting-sliding, sliding, window ventilators,
8. external roller shutters
9. concrete stairs
10. internal window sills - none, Buyer will provide on their own
11. external sills made of coated sheet metal or titanium-zinc or galvanized
12. entrance doors steel/aluminum, without internal doors, which Buyer
will provide and install on their own,
13. underfloor heating, gas, individual single-function boilers with a 140 L tank, De Dietrich/Buderus/Viessmann
14. gravity ventilation,
15. air conditioning installation,
16. cold water meter,
17. water-sewage installation
18. electrical installation - without lighting fixtures, single-phase with three-phase
approach under electric/induction stove in the kitchen, with equipment,
19. television installation, cabling without antennas
20. internet installation,
21. photovoltaic installation - 6 photovoltaic panels
22. video intercom - complete installation with intercom in the hall,
23. sanitary installation - with approaches under WC, sink, bathtub, sink and washing machine
without white assembly, i.e. without faucets, sinks, washbasins, bathtubs, WC
(in the bathroom and kitchen possibility of water-sewage pipes not embedded
in the wall and above the floor),
24. sectional garage door
25. facade - white structural plaster, mineral graphite tile e.g. Elastolith,
26. flat roof,
27. terrace - concrete slabs
28. land development - pedestrian-vehicle paths illuminated, hardened with paving
blocks,
29. garden fencing - panel mesh
LOCATION
Ksieze Wielkie is one of the greenest districts of Wroclaw. Neighboring areas include the Eastern Park, numerous walking and cycling paths, the kilometer bridge - the longest pedestrian and cyclist bridge in Poland, from which beautiful views unfold.
Commercial and service points
kindergarten (approx. 500 m), primary school (approx. 1 km), children's playroom (approx. 1.5 km), pharmacy (approx. 300 m), shop (approx. 100 m), gastronomic premises (approx. 100m).
Public transportbus lines no. 124, 134, 243 (bus stop about 200m away) and tram lines no. 3 and 5 (tram stop about 3.5 km away)
Expected completion date - September 2025
tel. 577 677 808Remigiusz PawlickiAs part of the brokerage service, we provide our clients with professional financial advisors with credit offers from many banks.
Are you interested in other locations? Call, I have about 80 investments on the primary market in Wroclaw!
********
The posted offer does not constitute an offer within the meaning of the Civil Code, and the data contained therein are for informational purposes only.
A21/2
Specifications:
Area: 138.31 m²
Bedrooms: 5
Floor: 1
Built: 2025
Additional Features:
Commission Free: True
Seller: Remigiusz Pawlicki
Contact: 577 677 808
Data source: https://www.otodom.pl/pl/oferta/garaz-w-bryle-ustawne-pomieszczenia-wrzesien-2025-ID4xJKK