INVESTMENT PLOT IN GRODZIEC, RIGHT BY CIESZYŃSKA STREET
Land property with an area of 3558m2.
In the vicinity, there are single-family buildings, production plants, green areas, and undeveloped plots.
A permit has been issued for the location of a new individual access from the provincial road No. 944 (Bielska Street).
The plot is located 1.5km from the geothermal drilling site - investment potential!
The property is covered by the Local Spatial Development Plan marked with the symbol PU2.5 and partially ZN36.
§ 23. Plan provisions for areas with symbols from PU2.1 to PU2.7 - areas for production facilities, warehouses, and service buildings:
1) primary purpose - production plants, warehouses, service buildings, and facilities for vehicle communication services, technical infrastructure facilities, service buildings;
2) complementary purpose: related land development;
3) regarding the parameters and indicators for shaping the development and land development, it is established:
a) maximum building area:
– for areas with symbols from PU2.1 to PU2.5: 75%,
– for areas with symbols from PU2.6 to PU2.7: 85%,
b) minimum percentage of biologically active area:
– for areas with symbols from PU2.1 to PU2.5: 15%,
– for areas with symbols PU2.6 to PU2.7: 5%,
c) minimum building intensity: 0.01,
d) maximum building intensity: 1.5,
e) maximum building height:
– for the area with the symbol PU2.1: 12 m,
– for areas with symbols from PU2.2 to PU2.7: 15 m,
f) roof geometry: flat roofs, two or multi-pitched roofs with a slope of up to 45º;
4) regarding the principles of shaping the development and land development, it is required to implement protective greenery from the boundary line of single-family residential areas and public services.
28. Plan provisions for areas with symbols from ZN.4 to ZN.43 - green areas:
1) primary purpose - green areas;
2) complementary purpose:
a) inland waters,
b) roads to agricultural and forest lands,
c) bicycle paths and pedestrian routes,
d) technical infrastructure,
e) small architecture objects,
f) hydrological structures related to existing natural streams and canals;
3) regarding the principles of shaping the development and land development and indicators for land development, it is required to maintain and protect existing watercourses along with their biological buffer, reed vegetation, tree stands, and shrubs.
WE INVITE YOU FOR A PRESENTATION!
The intermediary responsible for the execution of the brokerage agreement: Kamil Sowa (license no: 22069)
Specifications:
Area: 3558.0 m²
Seller: Karina Kaminska
Data source: https://www.otodom.pl/pl/oferta/dzialka-pod-budowe-hali-przy-drodze-ID4uQ2Q