Czerniewice | Przy Torze| Duplex - 5 Rooms | 128.13 m2
Attractive two-family houses in duplex construction, in developer condition.
Primary Market | No Commission | No PCC Tax
Lesne Czerniewice Stage II is a complex of 12 segments in duplex construction, located in direct proximity to forest areas with quick and smooth access to the center of Torun.
The investment has been designed for people who dream of space combined with functionality.
Designed media solutions in the building, including photovoltaic installation and recuperation with a central unit, ensure minimal heat loss, as well as improve the energy performance coefficients of the building, leading to savings in operating costs. Each unit will be equipped with a dual-function gas boiler, which powers underfloor heating and prepares hot water.
The presented unit 9A/1 with an area of 128.13 m2 will be located on the ground floor and the first floor of the building.
The ground floor consists of:
- vestibule – 3.74 m2,
- corridor – 3.53 m2,
- bathroom – 2.47 m2,
- garage – 17.92 m2,
- living room with kitchenette – 34.74 m2,
- internal stairs – 4.37 m2.
On the first floor of the building, there are:
- corridor – 5.66 m2,
- bathroom – 7.49 m2,
- room – 11.22 m2,
- room – 15.04 m2,
- room – 13.87 m2,
- room – 8.08 m2.
Additionally, there is a room in the attic and a terrace with an adjacent, designated garden. The terraces will be separated from each other by walls.
The advantage of this unit is a large garden and a greater number of windows in the living room, bathroom, kitchenette, and garage, which results from the location of the building. These windows are distributed on the ground floor and the first floor on the outer side of the building.
In front of the building, there will be parking spaces for two cars.
Window exposure - East - West - North
Equipment and standard:
PVC windows with triple glazing.
Recessed roller blinds, electrically controlled in all windows.
Insulation - polystyrene 20 cm.
Roof covered with ceramic or cement tiles.
Heating installation - underfloor with a gas boiler, dual-function.
Hydraulic installation with sewage.
Gas installation.
Photovoltaics installed on the roof of the building - 3.2 kW.
Recuperation with a central unit.
Garage door.
Anti-burglary external doors.
Gypsum or cement-lime plaster on the walls.
Floor screeds.
Rainwater collection from the roof drained to the sewage system.
Electrical and telecommunication installation distributed from the main distribution board to sockets and outlets throughout the house, photovoltaic panels on the roof (without white installation - sockets, devices).
Land development in the vicinity of the investment - single-family housing.
Completion of construction: May 30, 2026.
Date of handing over the premises for use: August 31, 2026.
Date of transfer of ownership: December 31, 2026.
Undoubtedly, the asset of the investment is its location. Within a short walking distance, there are: MZK bus stop, grocery store, playground, and sports fields, and within a longer walk: primary school, kindergarten, nursery, church, post office, bakery, and dining establishments.
At the opposite end of Zdrojowa Street, there is a newly established, publicly accessible playground, tennis court, roller rink, basketball court, and outdoor gym.
A bit further is the service center in the Stawki district, including Biedronka, Lidl, Rossmann. Along the main street towards Torun, there is a new bike path, which provides a safe way to reach both the service part of Czerniewice, the Primary School, and the center of Torun.
I highly recommend.
Our credit advisors, as part of comprehensive customer service, will prepare an attractive offer for you for the purchase of real estate, with funds obtained from a mortgage loan or credit support in another form, free of charge and professionally.
I invite you to ask questions via email or phone.
I invite you to a presentation meeting at our office at a convenient time, after prior appointment.
The transaction is carried out in accordance with the developer law of July 1, 2022, based on the information prospectus regarding the scope and standard of finishing the premises and payments to the escrow account, after signing the developer agreement and entries in the land and mortgage register of the sold property. The law extends buyer protection to all agreements made with the developer. The transaction under the law is covered by a 5-year warranty.
Specifications:
Area: 128.13 m²
Bedrooms: 5
Floor: 1
Built: 2026
Additional Features:
Duplex: True
Seller: Sławomir Skierski
Data source: https://www.otodom.pl/pl/oferta/czerniewice-przy-torze-blizniak-5-pokoi-128-13-m2-ID4sSo2